The so-called Oneida-Sabine Lake project includes about 50 miles of 345 kV lines from Eaton County to Livingston County.
In MCU-based projects, this design uses a single push button to switch on and switch off 5-V and 15-V supplies in sequence.
Remote sense provides a straightforward way to correct them by letting the supply monitor the voltage at the load itself and ...
Abstract: High-frequency signals were widely studied in the last decade to identify grid and channel conditions in power lines. Power Line Modems (PLMs) operating on the grid’s physical layer are ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results